Micon M530/250kW, in the Netherlands for Green Energy Service

“The Spica Retrofit Controller in a new panel was the best solution for this turbine”

This wind turbine is placed on a harbour in the north-western corner of the Netherlands. Corrosion in the panel and in the old controller had caused the turbine to break down. Spica Technology designed and built the new panel with the Spica Retrofit Control System at our production facilities in Silkeborg to be 100% ready for installation in the Netherlands.

This retrofit plug-and-play solution secured a quick installation with little downtime and the wind turbine was up and running and delivering valuable data after a short time.

Original Controller

Spica Retrofit Controller